The F3 Marina Project is the first fully automated dry stack boat storage facility open to the public. Situated on Fort Lauderdale’s 16th Street Canal, the Club features over 240 dry slips accommodating vessels up to 50 feet, along with 20 wet slips that serve as a convenient queuing area for boaters. This cutting-edge facility provides vessel storage and provisioning, marina fuel, pump-out services, and shore power, all secured with a Marina Guard protection system that meets national best practices.
The project included demolition of an existing building, replacement of the seawall, installation of a new floating dock system, and construction of the dry stack storage facility. Boater amenities include restrooms, a lounge area, storage lockers, a fish cleaning station, and viewing areas for observing the automated crane system in operation.
Edgewater was retained by F3 Marinas to provide comprehensive marine and civil engineering design, landscape architecture, and to manage the permitting and approvals process for the project.